Markovci hydroelectric power station
Published on
12-03-2018
Characteristics
| Installed turbine | 1 T800 |
| Installed power | 14 kW |
| Flow rate equipped | 2,60 m3/s |
| Head height | 1,14 m |
| Location | Maribor, Slovénie |
Project dating from March 2018 to equip a 14 kW T800 turbine integrated into a dam.
