Keralys Mill
Published on
06-11-2019
Characteristics
| Installed turbine | 2 T400 |
| Installed power | 2 * 5,6 kW |
| Flow rate equipped | 500 l/s |
| Head height | 3.80 m |
| Location | Finistère |
Project completed in October 2019. Turbines connected to Turbiboard cabinets and linked directly to the EDF grid.